Production Statistics

The following is a summary of annual copper and gold production to date:

Contained metal production

FY 2012

FY 2013

FY 2014

FY 2015

FY 2016

FY 2017 HY 2018 Total Project to date
COPPER (tonnes "000") 4 64 68 67 68 67 32 370
GOLD (ounces "000") 3 43 34 37 38 38 19 212

Production Guidance 2018

Production for the 12 months ending 30 June 2017 was 67,088 tonnes of copper and 38,623 ounces of gold, at a C1 cash operating cost of US$0.93/lb.

Production for the 2018 Financial Year is expected to be within the range of 63,000 to 66,000 tonnes of contained copper metal and 38,000 to 40,000 ounces of contained gold metal.  The C1 cost is expected to be approximately US$0.95-1.00/lb.