The following is a summary of annual copper and gold production to date:

Contained metal production

FY 2012

FY 2013

FY 2014

FY 2015

FY 2016

FY 2017 FY 2018 Total Project to date
COPPER (tonnes "000") 4 64 68 67 68 67 65 403
GOLD (ounces "000") 3 43 34 37 38 38 39 232

Production Guidance 2019

Production for the 12 months ending 30 June 2018 was 64,918 tonnes of copper and 39,273 ounces of gold, at a C1 cash operating cost of US$0.93/lb.

Production for the 2019 Financial Year is expected to be within the range of 63,000 to 67,000 tonnes of contained copper metal and 37,000 to 40,000 ounces of contained gold metal.  The C1 cost is expected to be approximately US$1.00-1.05/lb.