Production Statistics

The following is a summary of annual copper and gold production to date:

Contained metal production

FY 2012

FY 2013

FY 2014

FY 2015

FY 2016

1HFY 2017 Total Project to date
COPPER (tonnes "000") 4 64 68 67 68 34 305
GOLD (ounces "000") 3 43 34 37 38 20 175

Production Guidance 2017

Production for the 12 months ending 30 June 2016 was 68,202 tonnes of copper and 37,612 ounces of gold, at a C1 cash operating cost of US$0.95/lb.

Production guidance for the 2017 Financial Year is expected to be within the range of 65,000 to 68,000 tonnes of contained copper metal and 35,000 to 40,000 ounces of contained gold metal.  The C1 cost is expected to be approximately US$0.95-1.05/lb.